Used as a repair and recovery complex within brigades and units, operating locally in the "green" zone.
The workroom drives to the damaged vehicle, performs minor repairs, or tows it if necessary. The complex is equipped with an integrated power supply system: a diesel generator, a battery inverter with a solar panel, and the capability to connect to an external power grid.
The hand tools are selected according to European and American standards for bits and sockets. An integrated locksmith's workbench simplifies short-term repairs. The jump-start charger is compatible with 12V and 24V onboard systems. The vehicle design includes a reinforced front bumper and an electric winch for emergency extraction of heavy equipment from water crossings.
The project was implemented in collaboration with a civilian private company.